Skip to content
Green Ngoria Supplies Ltd
Bondo · Taita Taveta · Nairobi

Gold, engineeredend‑to‑end.

Producing mines, NEMA-approved CIP/CIL processing plants, and turnkey equipment installation across Kenya, Tanzania and East Africa.

Plant approval
NEMA/PR/SYA/002
Active sites
Bondo · Taita Taveta
Delivery model
Turnkey EPC · CIP/CIL
Regional reach
5 East-African countries
Scroll
Incorporated
27 September 2011
Company number
CPR/2011/57284
KRA PIN
P051642021R
Plant approval
NEMA/PR/SYA/002

Certified to

  • Mineral Dealer's (Processing) LicenceGold Buying, Processing & Export Rights
  • NEMA Environmental Impact Assessment LicenceArtisanal Gold Ore Mining Approval
  • Certificate of IncorporationPrivate Limited Corporation (Cap. 486)
  • KRA PIN & Tax Obligation CertificateActive Corporate Income Tax Obligation
  • BRS Official Company Search (CR12)Corporate Governance & Shareholding
See the full compliance record

Why clients choose Green Ngoria

Four things that make the difference on a producing mine site.
  • NEMA-approved plant

    Nyangoma processing plant licensed under NEMA/PR/SYA/002.

  • Turnkey EPC delivery

    One contract from feasibility to commissioned CIP/CIL circuit.

  • Licensed & compliant

    Licensed under Kenya Mining Act 2016, NEMA EMCA Cap 387 and verified KRA taxpayer.

  • Ten in-house divisions

    Mining, plant, civil, electrical, water, fuel, timber — one point of contact.

From deposit to poured bullion

Five disciplines under one roof — mining, processing, equipment, optimisation and delivery.

What we sell

Turnkey plants, certified equipment and independent optimisation — priced line-item, delivered as one contract.
  • Signature

    Turnkey gold processing plants

    Feasibility, engineering, civil works, mechanical installation, electrical automation and metallurgical commissioning — as one contract.

    • CIP / CIL circuits
    • Elution & doré pour
    • Tailings management
    Explore plant delivery
  • Catalogue

    Mining equipment & installation

    Certified mills, crushers, screens, cyclones, agitators and pumps — supplied, foundation-cast, aligned and commissioned on site.

    • Ball & rod mills
    • Gravity concentrators
    • Pumps & pipework
    Browse equipment
  • Optimisation

    Technical plant assessments

    Structured metallurgical audit of an installed circuit — grind, leach kinetics, adsorption, tails — with a written recovery-improvement plan.

    • Recovery diagnostics
    • Reagent optimisation
    • Throughput uplift
    Request an assessment
The Bondo NEMA-approved gold processing plant
NEMA/PR/SYA/002 · Nyangoma, Bondo

A working gold plant.Not a rendered one.

Green Ngoria’s Bondo site operates a licensed small-scale CIP circuit — leach, adsorption, elution and doré. Every photograph on this site is from that plant, or one we’ve built.

By the numbers

East-African countries
5

KE · TZ · UG · RW · BI

Producing mines
2

Bondo & Taita Taveta

Engineering divisions
10

Mining · plant · civil · electrical · logistics

Stage CIP/CIL circuit
7

Ore to doré

How we deliver

From first enquiry to a plant producing doré — four steps, one team.
  1. Step 01

    Enquiry

    Submit an RFQ or a brief description of the plant, site or equipment.

  2. Step 02

    Assessment

    Metallurgical review, site visit and scope definition within days.

  3. Step 03

    Engineering

    Process design, drawings, equipment sizing and installation plan.

  4. Step 04

    Commissioning

    Foundation, install, wet-commission, hand-over with recovery targets met.

Ore to doré, in seven stages

Select any stage to inspect its equipment scope and metallurgy.

Adsorption — CIP / CIL

0608

Activated carbon adsorbs dissolved gold from the pregnant leach solution.

Function
Gold recovery onto carbon
Typical equipment
  • CIP/CIL tanks
  • Carbon screens
  • Carbon transfer pump

CIL adds carbon to the leach tanks. CIP adds carbon after leaching. The two configurations lead to different tankage and screening arrangements.

Indicative unit operations only. A circuit configuration, its sizing and its reagent regime cannot be fixed without ore characterisation and metallurgical test work.

Certified, licensed, compliant

Prequalification-ready documentation available on request.
  • Mineral Dealer's (Processing) Licence
    Gold Buying, Processing & Export Rights
  • NEMA Environmental Impact Assessment Licence
    Artisanal Gold Ore Mining Approval
  • Certificate of Incorporation
    Private Limited Corporation (Cap. 486)
  • KRA PIN & Tax Obligation Certificate
    Active Corporate Income Tax Obligation
  • BRS Official Company Search (CR12)
    Corporate Governance & Shareholding

Corporate mining vision

“To be a responsible and internationally renowned mining company whose conduct of business is geared to significantly contribute to sustainable development of the mining industry in Kenya/Tanzania and the East African region at large.”
Corporate mining vision

Talk to Green Ngoria

Talk to a qualified engineer today

Customer Care answers direct on +254 704 160 431 · customercare@greenngoria.com. RFQs are acknowledged within 24 hours.

Engineer your next plant with us

A metallurgical review, or a line-item quote for equipment and installation. We’ll respond within 48 hours.

Customer care & enquiries

Director lines & emails: Leadership Profiles →

Tatu City, Kijani Ridge, Nairobi, Kenya