Mining Plant Construction & Turnkey Erection

Mining plant construction demands rigorous civil precision and specialized mechanical expertise. A slight misalignment in a 40-tonne ball mill or a defect in a 1,000 m³ leach tank foundation can cause catastrophic operational failure.

Our site teams comprise certified civil engineers, qualified coded welders, master riggers, and instrumentation specialists who execute every stage to procedure under ISO 9001 quality controls.

We handle all site logistics, concrete batching, heavy craneage, structural steel erection, slurry pipe fabrication, and pre-commissioning checks.

EHS Safety Record
Zero Lost Time (Strict ISO 18001 / OHSAS Adherence)
Heavy Rigging Capacity
Up to 100 Tonnes (Mobile Cranes & Precision Jacks)
Welding Standards
ASME IX Certified (100% NDT on Critical Slurry Lines)
Turnkey Delivery
EPC / EPCM (Civil, Mechanical & Electrical)
Heavy mobile crane erecting cylindrical ball mill onto reinforced concrete foundations
Heavy Mechanical Erection

Safe, on-schedule site construction, heavy mechanical erection, and pre-commissioning

Certified mining engineers and heavy rigging crew setting a primary ball mill onto reinforced dynamic foundation plinths.

Technical Imagery & Field Records

Visual Assets & Field Records — Mining Plant Construction & Turnkey Erection

Inspect high-resolution mechanical assemblies, 3D CAD flowsheets, on-site construction rigging, and diagnostic testing apparatus. Click any record to zoom up to 2.5x with full pixel clarity.

Heavy crane erecting ball mill on concrete foundation with engineers inspecting blueprints
Heavy Mechanical

Ball Mill Lifting & Placement

Precision positioning and laser alignment of a heavy cylindrical grinding mill shell onto reinforced concrete dynamic foundation pedestals.

Record #01 Click to zoom & inspect
Ball mill mechanical mounting and drive motor assembly on site at Bondo
Mechanical Mounting

Drive Motor & Pinion Assembly

Mechanical engineers aligning the electric drive motor, reduction gearbox, and girth gear pinion on the operating plant plinth.

Record #02 Click to zoom & inspect
CIL leach agitation tank farm circular wall construction and concrete foundation
Civil & Tanks

CIL Leach Tank Farm Erection

Civil and structural erection of circular leaching tanks, agitation baffle frames, and environmental containment bunding.

Record #03 Click to zoom & inspect
High-voltage substation and plant switchyard construction
Electrical Erection

Substation & Power Infrastructure

High-voltage transformer installation, switchyard grounding grid, and main power distribution to heavy plant motors.

Record #04 Click to zoom & inspect

Technical Scope & Certified Deliverables

Turnkey engineering, procurement, and construction (EPC) for mineral processing facilities. We execute heavy foundation casting, ball mill mounting, agitation tank farm erection, and high-voltage electrical commissioning.

Civil & Foundation Works

  • Reinforced Dynamic Machine PlinthsBS 8110 / ACI 318

    Mass concrete foundation casting with vibration dampeners for primary ball mills and crushers.

  • Secondary Containment & Bund WallsISO 14001 / NEMA

    Impermeable chemical-resistant containment bunds designed to hold 110% of tank volume.

  • Plant Civil Buildings & Gold RoomKPDA Security Specs

    Reinforced masonry construction for motor control centers, laboratory, and high-security gold room.

Mechanical Assembly & Rigging

  • Heavy Equipment Rigging & ErectionOSHA / BS 7121

    Certified lift planning and dual-crane maneuvers for oversized mill shells and thickener tanks.

  • Shaft Laser Alignment & BalancingISO 10816

    Sub-millimeter optical and laser alignment of motor-gearbox-trunnion drive trains.

  • Process Piping & Hydro-TestingASME B31.3

    Full radiographic / ultrasonic NDT testing on pressurized slurry, air, and cyanide circuits.

Core Competency Register

  • Site clearing, mass earthworks, terrace leveling and drainage formation
  • Reinforced concrete dynamic foundations for vibrating crushers and ball mills
  • Heavy structural steel fabrication, crane gantry erection and elevated walkways
  • Carbon-in-Leach (CIL) and Carbon-in-Pulp (CIP) steel tank assembly and welding
  • Mechanical alignment and laser leveling of rotary mills, gearboxes, and motors
  • High-pressure slurry pipework, HDPE line fusion and chemical manifold fabrication
  • Electrical substation installation, cable tray routing, MCC hookup and PLC wiring
  • Non-destructive testing (NDT), hydro-testing, pre-commissioning and punch list closeout

Phase-by-Phase Execution Pathway

Every stage produces auditable records and signoff gates so the project advances on verified empirical data rather than assumptions.
Phase 01

Mobilization & Site Establishment

Establish construction camp, security perimeters, batching plants, and temporary power.

Key Deliverables:
  • Site Execution Plan
  • EHS Induction Records
  • Survey Control Monuments
Signoff Gate: Site Mobilization Notice
Phase 02

Civil & Foundation Construction

Excavate and cast reinforced concrete foundations for heavy mills, crushers, and CIL tank farm.

Key Deliverables:
  • Concrete Cube Test Reports
  • Foundation Inspection Signoffs
  • Earthworks Compaction Logs
Signoff Gate: Civil Completion Certificate
Phase 03

Structural Steel & Mechanical Installation

Erect steel structures, place heavy process machinery, and weld tank shells and piping.

Key Deliverables:
  • Mechanical Alignment Reports
  • Welding NDT Certificates
  • Torque Audit Logs
Signoff Gate: Mechanical Completion Certificate
Phase 04

Cold Commissioning & Dry Run

Energize electrical systems, test motor rotation, verify sensor loops, and clear punch list items.

Key Deliverables:
  • Motor Run Test Sheets
  • Loop Check Dossier
  • Pre-Commissioning Signoff
Signoff Gate: Ready for Wet Commissioning Gate

Design Criteria & Technical Parameters

Key engineering tolerances, process capacities, and design standards applicable to this scope.
Engineering ParameterStandard Design CriteriaApplication & Notes
Concrete Compressive Strength (Plinths)C35/45 with sulfate-resistant cementEngineered for chemical resistance and dynamic loads
Mill Shaft Alignment Tolerance< 0.05 mm radial & axial runoutVerified with dual-axis laser measurement
Tank Weld Quality Testing100% Visual + 20% Dye Penetrant & RadiographyZero leakage tolerance on cyanide slurry tanks
Electrical Isolation RatingIP65 on all outdoor field motor isolatorsDust and water jet resistant for mine environments

Registered Engineering Standards & Review Boundary

All construction and mechanical erection activities are performed under strict EHS protocols with full daily site logging and certified quality inspection checkpoints.

Frequently Answered Engineering Questions

Direct technical guidance regarding specifications, implementation, and regulatory compliance.

Does Green Ngoria manage its own construction workforce and heavy machinery?

Yes. We maintain qualified permanent staff for construction management, certified welding, electrical installation, and rigging, backed by company-owned logistics and partnering crane fleets.

How does Green Ngoria ensure construction safety on remote mining sites?

We enforce a zero-harm EHS policy, mandatory daily toolbox talks, certified lift plans for all crane maneuvers, hot-work permits, and continuous environmental monitoring under ISO 14001.

What is the typical timeframe for constructing a modular CIP/CIL gold plant?

Depending on throughput capacity (e.g. 100 – 500 tpd), construction and cold commissioning typically take between 4 to 8 months from civil foundation commencement.

Tell us what you need built, processed or supplied

Send the scope, quantities and delivery location and the enquiry reaches the right division. For an installed circuit, a technical plant assessment is the faster route.