Plant Optimization & Metallurgical Recovery Audit

Optimization begins with empirical data: on-site slurry sampling, particle size distribution (PSD) analysis, cyanide consumption curves, carbon loading assays, and tailings diagnostic analysis.

Our metallurgical engineers audit each circuit stage to pinpoint exact recovery leaks — whether in gravity recovery, leaching kinetics, carbon activity, or electrowinning cell current efficiency.

We deliver a prioritized, cost-benefit ranked engineering recommendation report and provide hands-on implementation support to ensure sustained performance gains.

Typical Recovery Boost
+5% to +18% (Verified on Field Audits)
Reagent Cost Reduction
15% – 30% (Cyanide & Lime Consumption)
Diagnostic Timeframe
5 – 10 Days (On-Site Sampling & Assay)
Deliverable
Actionable Audit Dossier (Ranked Engineering Roadmap)
Metallurgical laboratory technician testing cyanide leaching kinetics and CIP carbon adsorption
Metallurgical Diagnostics

Eliminate process bottlenecks, reduce reagent waste, and maximize gold recovery yield

Metallurgical engineer conducting gold leaching kinetics, carbon adsorption profiling, and particle size distribution (P80) analysis.

Technical Imagery & Field Records

Visual Assets & Field Records — Plant Optimization & Metallurgical Recovery Audit

Inspect high-resolution mechanical assemblies, 3D CAD flowsheets, on-site construction rigging, and diagnostic testing apparatus. Click any record to zoom up to 2.5x with full pixel clarity.

Metallurgical testing laboratory showing digital leach curves and titration apparatus
Lab Kinetics

Leach Kinetics & Carbon Testing

Diagnostic laboratory testing measuring cyanide dissolution rates, lime consumption, and activated carbon loading capacity over time.

Record #01 Click to zoom & inspect
Field metallurgical engineer evaluating gravity concentration table performance
Gravity Audit

Gravity Separation Circuit Audit

On-site examination of centrifugal concentrators and shaking tables to maximize coarse free-gold recovery ahead of cyanide leaching.

Record #02 Click to zoom & inspect
Refined gold bullion bars weighed on certified analytical scale displaying 4.207 kg
Assay Verification

Precision Assay & Bullion Weighing

High-precision weighing (4.207 kg gold bullion batch) and certified assay verification to document recovery yields and custody provenance.

Record #03 Click to zoom & inspect
Knelson centrifugal concentrator optimization and water pressure tuning
Circuit Tuning

Centrifugal Concentrator Tuning

Fluidization water pressure and cycle-time optimization on centrifugal concentrators to boost single-pass recovery rates.

Record #04 Click to zoom & inspect

Technical Scope & Certified Deliverables

Comprehensive on-site and laboratory diagnostic audits for operating gold mineral processing plants. We evaluate grinding efficiency, cyanide leach kinetics, carbon adsorption capacity, and tailings losses.

Diagnostic Testing Scope

  • Grind Size Distribution (PSD / P80)ASTM E11

    Determines whether gold is under-liberated (too coarse) or over-ground into slime.

  • Diagnostic Cyanidation Leach TestsMetallurgical Standard

    Identifies refractory gold locked in sulfides, carbonaceous matter, or silicate matrix.

  • Carbon Activity & Fouling ProfileASTM D3838

    Measures carbon adsorption rate (R-value) and organic/calcium carbonate fouling levels.

Engineering Recommendations

  • Circuit Bottleneck Identification ReportGreen Ngoria System 4

    Pinpoints specific equipment and process stages constraining plant throughput or recovery.

  • Reagent Optimization ScheduleCyanide Code Aligned

    Calculated stoichiometric dosing rates for NaCN, hydrated lime, lead nitrate, and flocculants.

  • Prioritized Capital / Operational RoadmapCost-Benefit Matrix

    Clear list of quick-win operational tweaks vs high-ROI equipment upgrades.

Core Competency Register

  • Comprehensive plant mass balance and metallurgical circuit sampling
  • Grinding circuit profiling (P80 particle size distribution and recirculating loads)
  • Hydrocyclone classification cut-point (D50) and apex/vortex finder optimization
  • Cyanide leaching kinetics, dissolved oxygen profiling and lime buffer tuning
  • Activated carbon activity testing, attrition rate audit and regeneration review
  • Elution column temperature, pressure, and electrowinning cell current efficiency audit
  • Tailings assaying (solid vs solution gold loss breakdown and diagnostic leach)
  • Reagent dosing automation and operational Standard Operating Procedure (SOP) updates

Phase-by-Phase Execution Pathway

Every stage produces auditable records and signoff gates so the project advances on verified empirical data rather than assumptions.
Step 01

Baseline Assessment & Data Intake

Review historical production records, head grades, reagent logs, and plant flowsheets.

Key Deliverables:
  • Baseline Data Audit Log
  • Sampling Point Map
  • Diagnostic Test Plan
Signoff Gate: Audit Scoping Agreement
Step 02

On-Site Slurry Sampling & Field Measurements

Conduct synchronized sampling across all circuit stages over full operating shifts.

Key Deliverables:
  • Shift Slurry Sample Log
  • Slurry Density Measurements
  • DO & pH Profile Sheets
Signoff Gate: Sampling Campaign Signoff
Step 03

Laboratory Assays & Kinetics Modeling

Perform size fraction assays, diagnostic leaching, and carbon adsorption kinetic tests.

Key Deliverables:
  • Metallurgical Assay Sheets
  • Leach Kinetic Curves
  • Tailings Loss Breakdown
Signoff Gate: Laboratory Results Report
Step 04

Engineering Report & Implementation Support

Deliver prioritized recommendations and assist plant operators in tuning circuit parameters.

Key Deliverables:
  • Plant Optimization Master Report
  • Updated Operator SOPs
  • Verification Assay Log
Signoff Gate: Optimization Closeout Review

Design Criteria & Technical Parameters

Key engineering tolerances, process capacities, and design standards applicable to this scope.
Engineering ParameterStandard Design CriteriaApplication & Notes
Dissolved Oxygen (DO) in Leach Tanks6.0 – 8.5 ppm continuousMaintained via spargers or compressed air injection
Slurry pH Buffer Level10.2 – 10.8 with Hydrated LimePrevents toxic HCN gas formation and optimizes cyanide efficiency
Carbon Concentration in CIL Tanks10 – 20 g/L slurry volumeStaged counter-current movement to minimize solution losses
Electrowinning Single-Pass Gold Deposition> 90% solution gold strippedOptimized voltage, flow rate, and cathode surface area

Registered Engineering Standards & Review Boundary

Plant optimization recommendations are based on verified metallurgical testing and engineering analysis, subject to final client operational approval.

Frequently Answered Engineering Questions

Direct technical guidance regarding specifications, implementation, and regulatory compliance.

How quickly can Green Ngoria perform an on-site plant optimization audit?

Our metallurgical audit team can mobilize within 3 to 7 business days. On-site sampling typically requires 3 to 5 days, followed by laboratory assays and delivery of the final optimization report within 10 to 14 days.

Can optimization reduce our cyanide and reagent expenditure?

Yes. Most processing plants over-dose cyanide and lime due to lack of real-time kinetic control. Optimization typically cuts reagent costs by 15% to 30% while maintaining or increasing recovery.

Does the audit include recommendations for re-processing old tailings?

Yes. We conduct diagnostic tailings assays to determine recoverable gold in existing tailings dams and engineer economic regrind or CIL re-treatment flowsheets.

Tell us what you need built, processed or supplied

Send the scope, quantities and delivery location and the enquiry reaches the right division. For an installed circuit, a technical plant assessment is the faster route.

Customer care & enquiries

Director lines & emails: Leadership Profiles →

Tatu City, Kijani Ridge, Nairobi, Kenya