Skip to content
Green Ngoria Supplies Ltd

Active gold vein mining, concessions and mineral processing across East Africa

Green Ngoria provides all aspects of gold mining services. The company began by pursuing mining activities in Tanzania and later extended its operations into Bondo in Siaya County, Kenya, and into Taita Taveta.

Mining is the core discipline the rest of the business grew around: our engineering, construction, mechanical, electrical and supply divisions all exist to support producing sites and the processing plants that serve them.

A small-scale gold processing plant at Nyangoma, Bondo Sub-County, approved by NEMA (Permit Ref: NEMA/PR/SYA/002), sits at the operational centre of our Kenyan gold extraction activity.

Mining Concessions
Kenya & Tanzania (Bondo, Taita Taveta & Tanzanian Assets)
Processing Plant
NEMA Approved (Permit Ref: NEMA/PR/SYA/002)
Extraction Circuits
CIP / CIL / Gravity (Shaking Tables & Cyanidation)
Licensing Status
Stamp Duty Paid (Ministry of Mining Compliance)
Poured gold doré bullion bar produced on site at Green Ngoria Bondo mine
Active Gold Production

Gold Mining & Mineral Extraction

Refined gold doré bullion bar smelted and poured directly from Green Ngoria’s operating Bondo gold facility.

Technical Imagery & Field Records

Gold Mining & Mineral Extraction — Technical Portfolio

Authentic high-resolution documentation from Green Ngoria operations, field sites, and technical delivery across East Africa. Click any photo to zoom in up to 2.5x with full pixel clarity.

Poured gold doré bar smelted on site from Bondo processing plant output.
Gold Doré

Poured Gold Doré Bullion

Poured gold doré bar smelted on site from Bondo processing plant output.

Record #01 Click to zoom & inspect
Coarse native gold nuggets recovered through gravity sluicing and optical sorting.
Native Gold

Natural High-Grade Nuggets

Coarse native gold nuggets recovered through gravity sluicing and optical sorting.

Record #02 Click to zoom & inspect
Refined gold bullion bars batch weighed (4.207 kg) on certified digital analytical scales for assay verification and custody transfer.
Assay Verification

Precision Assay & Bullion Weighing

Refined gold bullion bars batch weighed (4.207 kg) on certified digital analytical scales for assay verification and custody transfer.

Record #03 Click to zoom & inspect
High-grade gold ore specimen showing visible gold mineralization in quartz matrix.
Ore Geology

Quartz Vein Mineralization

High-grade gold ore specimen showing visible gold mineralization in quartz matrix.

Record #04 Click to zoom & inspect
Deep exploration diamond drill rig investigating orebody continuity and grade.
Exploration

Exploration Core Drilling

Deep exploration diamond drill rig investigating orebody continuity and grade.

Record #05 Click to zoom & inspect

Technical Scope & Certified Deliverables

Turnkey gold mining operations, shaft sinking, vein extraction, and NEMA-approved CIP/CIL processing facilities in Bondo, Taita Taveta, and Tanzania.

Mining & Extraction Scope

  • Underground Vein Shaft SinkingMining Safety Code

    Vertical and inclined shaft sinking with reinforced timbering, hoisting gear, and ventilation.

  • Open-Cast & Alluvial ExtractionCivil Earthworks

    Excavation of surface ore deposits and alluvial gravel beds feeding primary scrubbers.

  • CIP/CIL Processing & SmeltingNEMA Approved

    Closed-circuit crushing, ball milling, gravity concentrators, CIL cyanidation, and bullion smelting.

Scope of Work — Official Company Profile

  • Gold mining operations at Bondo, Siaya County, Kenya
  • Gold mining operations at Taita Taveta, Kenya
  • Gold mining operations and concessions in Tanzania
  • NEMA-approved small-scale gold processing plant at Bondo, Siaya
  • Mining licences held with stamp duty paid in October 2019
  • Responsible environmental containment and lined tailings storage
  • Full statutory compliance under the Kenya Mining Act and NEMA regulations

Phase-by-Phase Execution Pathway

Every stage produces auditable records and signoff gates so the project advances on verified empirical data rather than assumptions.
Phase 01

Prospecting & Geochemical Mapping

Trenching, geochemical soil sampling, and structural vein mapping across concession coordinates.

Key Deliverables:
  • Geological Map
  • Surface Assay Log
Signoff Gate: Target Delineation
Phase 02

Shaft Sinking & Ore Intersect

Excavate access shaft, install hoisting headframes, and establish ventilation and dewatering.

Key Deliverables:
  • Shaft Engineering Log
  • Dewatering Records
Signoff Gate: Orebody Intersect Gate
Phase 03

Commercial Extraction & Plant Feed

Extract gold-bearing ore, crush, mill, and recover doré bullion at the Bondo facility.

Key Deliverables:
  • Daily Production Records
  • Doré Assays
  • Royalty Filings
Signoff Gate: Commercial Bullion Smelt

Design Criteria & Technical Parameters

Key engineering tolerances, capacities, material grades, and statutory standards applicable to this scope.
Parameter / SpecificationStandard Design CriteriaApplication & Engineering Notes
Target CommoditiesGold (Au), Silver (Ag) by-productPrimary quartz vein and alluvial deposits
Environmental LicenceNEMA/PR/SYA/002Issued by County Director of Environment, Siaya
Doré Bullion Purity88% – 96% Au content prior to refiningDirectly smelted using induction furnaces

Strategic Mining Directives

Growth Strategy Commitments

The six strategic pillars that guide Green Ngoria’s mining operations.

  • Growing production throughput responsibly
  • Growing operating margins through in-house plant engineering
  • Growing international and regional joint-venture partnerships
  • Growing skilled local workforce and engineering talent
  • Growing geological reserves through disciplined exploration
  • Growing safety standards with zero-harm EHS policies

Standing Quality & EHS Commitments

Health, Safety & Environment
Environment, Health and Safety is given absolute priority in all projects the company undertakes, adhering strictly to NEMA EMCA Cap 387, OSHA 2007, and environmental mining regulations.
Independent Quality Control
Recognised quality-control institutions and accredited materials consultants are contracted to perform batch testing that verifies high product quality on every site.
Regional Delivery Footprint
Green Ngoria operates across Kenya, Tanzania, Uganda, Rwanda, Burundi, with corporate headquarters at Tatu City, Kijani Ridge, Nairobi.

Frequently Answered Questions

Direct technical guidance regarding specifications, contracting models, and delivery timelines.

Does Green Ngoria partner with international mining investors?

Yes. We engage with institutional investors and joint-venture partners on concession expansion, exploration drilling, and processing plant upgrades.

How is environmental protection maintained at the Bondo processing plant?

The plant operates under NEMA approval Ref: NEMA/PR/SYA/002, featuring impermeable lined tailings containment, cyanide destruction protocols, and zero untreated discharge.

Discuss a Mining Opportunity

Reach our customer care on +254 704 160 431 or email customercare@greenngoria.com — or send the details through the request for quotation form and our engineering team will respond with a full proposal.

Customer care & enquiries

Director lines & emails: Leadership Profiles →

Tatu City, Kijani Ridge, Nairobi, Kenya