Skip to content
Green Ngoria Supplies Ltd

Request Technical Plant Assessment & Feasibility

Green Ngoria’s Technical Plant Assessment (System 4) is our structured engineering intake mechanism for mining operators, concessions, and investors across East Africa.

Submit your deposit characteristics, target throughput, and existing equipment bottlenecks to receive an empirical flowsheet review, equipment sizing bill, and budgetary proposal.

Intake Framework
System 4 Digital Assessment
Engineering Review
Within 24 – 48 Hours
Output Deliverables
Flowsheet & Capex Estimate
Applicable Standards
ASME · ASTM · ISO 9001/14001
3D CAD engineering model for gold mineral processing plant
System 4 Engineering Intake

Empirical Flowsheet Design & Plant Optimization

Evaluates ore throughput, grinding power requirements, hydrocyclone classification, and CIL retention times.

Digital Plant Assessment & Feasibility Form

Complete the multi-step intake below. Your data is analyzed by qualified metallurgical and mechanical engineers to develop an actionable engineering proposal.

Step 1: Client, Project & Concession Profile

Enter your commercial organization and mining concession coordinates for engineering intake.

Quick Select Operating Region

Four Core Assessment Dimensions

Every plant assessment systematically evaluates the complete operational chain.

1. Geology & Ore Matrix

Head grade (g/t Au), mineralogical associations, host rock hardness (Bond Work Index), and clay viscosity profile.

2. Milling & Classification

Crushing stage reduction ratios, closed-circuit ball mill power (kW), and hydrocyclone P80 grind distribution.

3. Leaching & Recovery

Cyanide dissolution kinetics, dissolved oxygen levels, carbon adsorption loading (g/t), and electrowinning efficiency.

4. Utilities & Containment

Process water reticulation (m³/hr), power grid / generator capacity (kVA), and HDPE-lined tailings containment.

Technical Imagery & Field Records

Plant Assessment & Metallurgical Audit Records

High-resolution records of engineering CAD simulations, kinetic lab testwork, and operational site audits. Click any image to zoom up to 2.5x with full pixel clarity.

3D CAD process plant layout and mechanical flow sheet evaluation
Flowsheet Audit

3D Process Plant Flowsheet Review

Digital CAD flowsheet analysis evaluating crushing stages, ball mill power sizing, hydrocyclone classification, and CIL retention times.

Record #01 Click to zoom & inspect
Laboratory assaying and gold leaching kinetics testing apparatus
Ore Analysis

Ore Assaying & Leaching Kinetics Lab

Metallurgical laboratory testwork measuring Bond Work Index, cyanide leach dissolution curves, and carbon loading efficiency.

Record #02 Click to zoom & inspect
Bondo gold processing plant operating site overview
Site Utilities

Operating Site Infrastructure & Utilities

Field assessment of power grid connectivity, backup generation, process water supply, and tailings containment.

Record #03 Click to zoom & inspect
Refined gold bullion bars weighed on certified scale
Assay Verification

Yield Verification & Bullion Assays

High-precision weighing and atomic absorption assaying to verify recovery gains and mass balance calculations.

Record #04 Click to zoom & inspect

Technical Assessment FAQs

Common questions regarding our engineering evaluation process and deliverables.

How quickly will I receive a response after submitting the assessment?

Our engineering department completes an initial desk metallurgical evaluation and contacts you within 24 to 48 business hours with preliminary findings and scope clarification.

Does the assessment cover both new greenfield plants and existing plant optimization?

Yes. We assess both brand-new processing plants (from mine design to turnkey commissioning) and existing facilities suffering from low recovery rates, high wear, or bottlenecks.

Is the initial digital assessment free of charge?

Yes. The initial digital desk review and budgetary engineering scope are provided without charge. If physical ore sampling, core drilling assays, or comprehensive on-site audits are required, a transparent proposal will be issued.

Are recommendations certified engineering advice?

All technical recommendations and calculations undergo rigorous internal review by registered professional engineers before being formally transmitted to clients.

Ready to optimize your gold recovery or build a new plant?

Submit your technical plant assessment today or contact our managing director's office directly in Nairobi for confidential project discussions.

Customer care & enquiries

Director lines & emails: Leadership Profiles →

Tatu City, Kijani Ridge, Nairobi, Kenya